Song Lo II Industrial Park is invested and built in Song Lo commune, Phu Tho province. Along with a prime geographical location, preferential rents, modern and synchronous technical infrastructure, Song Lo II Industrial Park is an ideal stop for wise investors from other countries.
- Project Implementation Time:
- Investment preparation period: 2021 to 2023
- Commencement date: 25/06/2023
- Construction investment phase: From 2023
- Total planned land area: 165.65ha
- Location:
- Distance from Van Quan intersection of Noi Bai - Lao Cai Expressway: 5.5Km
- Distance from the administrative center of Phu Tho province: 8Km
- Distance from Lao Cai - Hai Phong railway station: 8Km
- Distance from Noi Bai airport: 50Km
- Distance from Hanoi city center: 75Km
- Distance from Hai Phong port: 180Km
- Contact the Investment Attraction Department:
- Ms. Nguyen Thi Hoan Position: In charge of investment attraction
- Phone: 0867 44 85 86
- Mail: kcnsonglo2@vpid.vn; idv@vpid.vn
- Address: Khai Quang Industrial Park, Vinh Phuc Ward, Phu Tho Province
Detailed description
|
LOCATION |
DIRECTIONS MAP |
|
Description |
Song Lo Commune, Phu Tho Province |
|
Major cities |
75 km from Hanoi Capital Center |
|
Nearest Seaport |
180 km from Hai Phong Port |
|
Nearest Airport |
50 km from Noi Bai International Airport |
|
Expressway |
5.5 km from Van Quan Interchange, Noi Bai - Lao Cai Expressway |
|
Nearest railway station |
8 km from Son Dong railway station on the Lao Cai - Hai Phong railway line |
|
INFRASTRUCTURE |
|
|
Construction Site |
Currently undergoing infrastructure construction and land leveling |
|
Power Supply |
Continuous and stable supply from a 110/35/22 KV substation |
|
Water Supply |
Clean water plant capacity: 16,000m³/day-night. Planned capacity by 2030: 50,000m³/day-night |
|
Telecommunications |
International standards, 24-48 lines/ha. Underground fiber optics to the fences |
|
Waste Management |
Classified, collected, and treated by licensed professional units |
|
Wastewater |
Treatment plant capacity: 6,000m³/day-night with reserve land for expansion |
|
Drainage and Sewerage System |
The rainwater drainage and wastewater systems (including industrial and domestic wastewater) are constructed separately. Rainwater is collected through a culvert system and discharged into local rivers. Wastewater is collected and conveyed to the Industrial Park’s centralized wastewater treatment plant. |
|
Fire Prevention and Fighting (PFP) |
The water supply system and fire hydrants are strategically arranged along the industrial park's internal roads, with a maximum distance of 150m between each hydrant. |
|
Housing |
Available for workers, foreign experts, and management staff |
|
Internal Traffic |
Central roads: 37m wide; Branch roads: 24m wide. Street lighting system installed |
|
COSTS |
|
|
Lease Price |
Contact for details |
|
Target Sectors for Investment |
- Mechanical Engineering Industry - Electronics Industry - Electrical Equipment Industry - Construction Materials - Light Industries: Textiles (excluding dyeing), Garments, Footwear, Cosmetics Manufacturing, and Fruit and Vegetable Processing and Preservation - Manufacturing and Processing Industries - Water Supply; Waste and Wastewater Management and Treatment - Production and Distribution of Electricity, Gas, Hot Water, Steam, and Air Conditioning - Transportation and Warehousing |
|
Labor Cost |
Region 3 minimum wage: 159.2 USD/month |
|
Wastewater Fee |
0.5 USD/m³ (monthly payment) |
|
Management Fee |
0.5 USD/m²/year |
|
Investment Incentives |
|
|
CIT |
Exempt for the first 02 years; 50% reduction for the next 04 years |
| Import Tax | Exempt for machinery creating fixed assets; materials for processing/export; and goods not yet produced domestically |
| Legal Support | Complimentary guidance for business registration, Investment Registration Certificate (IRC), and administrative procedures |


