VINH PHUC INFRASTRUCTURE DEVELOPMENT JOINT STOCK COMPANY
  • en vi
  • Song Lo 2 Industrial Park - Phu Tho

    Song Lo II Industrial Park is invested and built in Song Lo commune, Phu Tho province. Along with a prime geographical location, preferential rents, modern and synchronous technical infrastructure, Song Lo II Industrial Park is an ideal stop for wise investors from other countries.

    • Project Implementation Time:

     - Investment preparation period: 2021 to 2023

    - Commencement date: 25/06/2023

     - Construction investment phase: From 2023

     - Total planned land area: 165.65ha

    • Location:

    - Distance from Van Quan intersection of Noi Bai - Lao Cai Expressway: 5.5Km

    - Distance from the administrative center of Phu Tho province: 8Km

    - Distance from Lao Cai - Hai Phong railway station: 8Km

     - Distance from Noi Bai airport: 50Km

     - Distance from Hanoi city center: 75Km

     - Distance from Hai Phong port: 180Km

    • Contact the Investment Attraction Department:

    - Ms. Nguyen Thi Hoan Position: In charge of investment attraction

    - Phone: 0867 44 85 86

     - Mail: kcnsonglo2@vpid.vn; idv@vpid.vn

    - Address: Khai Quang Industrial Park, Vinh Phuc Ward, Phu Tho Province

    Detailed description

    LOCATION

    DIRECTIONS MAP

    Description                  

    Song Lo Commune, Phu Tho Province

    Major cities 

    75 km from Hanoi Capital Center

    Nearest Seaport              

    180 km from Hai Phong Port

    Nearest Airport

    50 km from Noi Bai International Airport

    Expressway                   

    5.5 km from Van Quan Interchange, Noi Bai - Lao Cai Expressway

    Nearest railway station

    8 km from Son Dong railway station on the Lao Cai - Hai Phong railway line

    INFRASTRUCTURE

     

    Construction Site

    Currently undergoing infrastructure construction and land leveling

    Power Supply                    

    Continuous and stable supply from a 110/35/22 KV substation

    Water Supply

    Clean water plant capacity: 16,000m³/day-night. Planned capacity by 2030: 50,000m³/day-night

    Telecommunications                                                                          

    International standards, 24-48 lines/ha. Underground fiber optics to the fences

    Waste Management

    Classified, collected, and treated by licensed professional units

    Wastewater

    Treatment plant capacity: 6,000m³/day-night with reserve land for expansion

    Drainage and Sewerage System

    The rainwater drainage and wastewater systems (including industrial and domestic wastewater) are constructed separately. Rainwater is collected through a culvert system and discharged into local rivers. Wastewater is collected and conveyed to the Industrial Park’s centralized wastewater treatment plant.

    Fire Prevention and Fighting (PFP)

    The water supply system and fire hydrants are strategically arranged along the industrial park's internal roads, with a maximum distance of 150m between each hydrant.

    Housing

    Available for workers, foreign experts, and management staff

    Internal Traffic

    Central roads: 37m wide; Branch roads: 24m wide. Street lighting system installed

    COSTS

     

    Lease Price

    Contact for details

    Target Sectors for Investment

    - Mechanical Engineering Industry

    - Electronics Industry

    - Electrical Equipment Industry

    - Construction Materials

    - Light Industries: Textiles (excluding dyeing), Garments, Footwear, Cosmetics Manufacturing, and Fruit and Vegetable Processing and Preservation

    - Manufacturing and Processing Industries

    - Water Supply; Waste and Wastewater Management and Treatment

    - Production and Distribution of Electricity, Gas, Hot Water, Steam, and Air Conditioning

    - Transportation and Warehousing

    Labor Cost

    Region 3 minimum wage: 159.2 USD/month

    Wastewater Fee

    0.5 USD/m³ (monthly payment)

    Management Fee

    0.5 USD/m²/year

    Investment Incentives

     

    CIT

    Exempt for the first 02 years; 50% reduction for the next 04 years

    Import Tax Exempt for machinery creating fixed assets; materials for processing/export; and goods not yet produced domestically
    Legal Support Complimentary guidance for business registration, Investment Registration Certificate (IRC), and administrative procedures